A new aerated sewage lagoon is required in a small town. Earlier this year one was built on a similar site in an adjacent city for $2.3 million . The ew lagoon will be 65% larger. Use the data in table 2-1 to estimate the cost of the lagoon.
A. $5.05 M
B. $3.05 M
C. $4.05 M
D.$ 2.05 M