Answer: 1.4 minutes
Explanation:
Given that,
Task time (1) = 0.3 minutes
Task time (2) = 1.4 minutes
Task time (3) = 0.7 minutes
Minimum cycle time refers to the task which has the longest task time.
Maximum cycle time is simply the sum of all the task time.
Therefore,
Minimum cycle time = Length of longest task time
= Task time (2)
= 1.4 minutes