The mean for both processes is 28+17 = 45 minutes.
The variance is additive, so the total variance is 5+4 = 9. The standard deviation is the square root of variance, which is 3 minutes.
Then the z-score associated with a time of x = 50 minutes is:
z = (x - mean)/SD = (50 - 45)/3 = 1.67
From a z-table, the probability that (z > 1.67) is 0.0475.