Dudly drafting services uses a 45% material loading charge and a labor rate of $20 per hour. how much will be charged on a job that requires 3.5 hours of work and $40 of materials? $128 $110 $88 $133

Respuesta :

How to get material loading charge total;

is. ℅
_ = _ x 45
of 100 _ = _
40. 100 = $18

How to get labor charge total;

20*3.5. = $70

How to get total for all charges;

$70+$18

Answer= $88

A job that requires 3.5 hours of labor will cost $128 in labor.

Find Total cost of material work-

Drafting material charge = 45%

Charge of material work = $40

CONVERT

Cost of material work = $40*45/100

                                    = $18

Total cost of material work = (charge + cost ) of material work

                                              =(40+18)$

                                              = $58

Find Labour Cost-

Labour Cost        = $20 per/hr.

Charge for 1 hr.    = $20* 1

                             = $20

Formula = Labor Cost= Pay Rate * Project Time.

Charge for 3.5 hr. = $20 * 3.5

                              = $ 70

Then, Total for all charges = $58+$70

                                            = $128

Therefore, $128 in labor is charged for 3.5 hours.

What is labour hour rate?

  • A cost rate which is used in absorption costing to charge the overheads of a department or cost center in the cost of a product or job.

How do you calculate Direct labor hours?

  • The pay rate multiplied by the time spent working on the project yields the direct labor cost,  Direct Labor Cost= Pay Rate * Project Time.