Respuesta :
How to get material loading charge total;
is. ℅
_ = _ x 45
of 100 _ = _
40. 100 = $18
How to get labor charge total;
20*3.5. = $70
How to get total for all charges;
$70+$18
Answer= $88
is. ℅
_ = _ x 45
of 100 _ = _
40. 100 = $18
How to get labor charge total;
20*3.5. = $70
How to get total for all charges;
$70+$18
Answer= $88
A job that requires 3.5 hours of labor will cost $128 in labor.
Find Total cost of material work-
Drafting material charge = 45%
Charge of material work = $40
CONVERT
Cost of material work = $40*45/100
= $18
Total cost of material work = (charge + cost ) of material work
=(40+18)$
= $58
Find Labour Cost-
Labour Cost = $20 per/hr.
Charge for 1 hr. = $20* 1
= $20
Formula = Labor Cost= Pay Rate * Project Time.
Charge for 3.5 hr. = $20 * 3.5
= $ 70
Then, Total for all charges = $58+$70
= $128
Therefore, $128 in labor is charged for 3.5 hours.
What is labour hour rate?
- A cost rate which is used in absorption costing to charge the overheads of a department or cost center in the cost of a product or job.
How do you calculate Direct labor hours?
- The pay rate multiplied by the time spent working on the project yields the direct labor cost, Direct Labor Cost= Pay Rate * Project Time.
Learn more about Direct labor on:
brainly.com/question/17094150
#SPJ2