Estimated total manufacturing overhead=total fixed cost+total variable cost
Estimated total manufacturing overhead=838,790+3.3×72,900
=1,079,360
Predetermined oH rate=Estimated total manufacturing overhead÷Estimated total manufacturing overhead
Predetermined oH rate=1,079,360÷72,900=14.81