The solution would be like this for this specific problem:
Take note that the most
important given is 1,700lbs of gravel.
1700 lbs of gravel * 6 cubic yards of concrete
= 10,200
Therefore, 10,200 pounds of gravel will be used to pour 6 cubic yards of concrete.