The costs of the preproduction stage, the producer, director, cast, and screenwriter are called __________ costs, while the costs of production, post production, and the crew are called ____________ costs.
To answer your question, below-the-line is for the first blank and above-the-line would be for the second. However, you put this in the Social Studies category, which isn't very accurate. I'm not sure Brainly has a category for Film or Drama but I think putting it in a different category would have given you a better and more explained answer than this one.