The South Padre island crew built an average of 208.5 feet per month, which means that in 2.5 years ( or 30 months ) this crew built
[tex]208.5\frac{ft}{m}\times30m=6255ft[/tex]6255 feet of the bridge.
We are told that the two crews together built 12,513 feet of bridges. Meaning Port Isabel crew built
[tex]12,513ft-6255ft=6258ft[/tex]6258 feet of the bridge.
(a).
Port Isabel crew built
[tex]\frac{6258ft}{30m}=208.6\frac{ft}{m}[/tex](b). Port Isabel crew built 6258 feet while South Padre crew built 6255 feet of the bridge.