a. The work motor of the crane did is 60.6 kJ.
b. The average power performed by the crane is 21.263kW.
Work done is equal to product of force applied and distance moved.
Work = Force x Distance
Given is a crane at a construction site lifts a concrete block with a mass of m = 277 kg from the ground to the top of a building with a height of h = 22.3 m.
a. Work done by motor is W= F x d
The force is equal to the weight F = mg
So, W = 277 x 9.81 x 22.3
W = 60.6 kJ
Thus, the work done by the motor is 60.6 kJ.
b. The duration of the lift was 2.85 minutes
Power = Work done/ time
Plug the values, we ghave
P = 60.6 x1000 /2.85
P =21.263kW
Thus, the average power performed by the crane is 21.263kW
Learn more about Work done
brainly.com/question/13662169
#SPJ1