Put these in order:

The bride structure experiences structural stress.

The fright train loaded with iron ore passes over the bride

The bridge collapses

The beams of the rail bridge bend slowly.

The bridge carries 10 trains a day

The beams of a rail bridge give away

A rail was build here 30 years ago

The bridge is experiencing structural fatigue.

The bridge is experiencing structural failure.

Respuesta :

•a rail was build here 30 yrs ago
•the bridge carries 10 trains a day
•the beams of the rail bridge bend slowly
•the bridge is experiencing structural fatigue
•the beams of a rail bridge give away
• the bridge is experiencing structural failure
•the bridge collapses

I believe those are the correct answers