Carl wants to earn money shoveling snow from driveway this winter. The average size of a driveway in his neighborhood is 240 ft. ² it take a squirrel 45 minutes to shovel an average size driveway with 4 inches of snow. Enter the minimum number of minutes it will take her to shovel a driveway with 4 inches of snow that has an area of 720 ft. ² if he shovels at this rate. 

Respuesta :

Using proportions, it is found that it will take him at least 135 minutes to shovel the driveway at this rate.

What is a proportion?

A proportion is a fraction of a total amount, and the measures are related using a rule of three.

In this problem, it takes 45 minutes to shovel 240 ft². How long does it take to showel 720 ft²? The rule of three is given by:

45 min - 240 ft²

n min - 720 ft²

Applying cross multiplication:

240n = 45 x 720

n = 45 x 720/240

n = 45 x 3

n = 135

It will take him at least 135 minutes to shovel the driveway at this rate.

More can be learned about proportions at https://brainly.com/question/24372153

ACCESS MORE