It takes them 12 hours to design a total of 7 logos if they both start working at the same time
This is the amount per unit time.
Since one graphic designer takes 3 hours to design a logo. Her less experienced colleague takes 4 hours to design a logo, we need to find the rate at which the work is done.
Now, since we require the time to desigh 7 logos, this time is T = number of logos/combined rate
= 7 logos ÷ 7/12 logo/hr
= 12 hr
So, it takes them 12 hours to design a total of 7 logos if they both start working at the same time
Learn more about time here:
https://brainly.com/question/25173515