The work would be finished 2.25 times faster if they had been doing the work at the same time.
Assumption;
In essence, the total time required to finish the ditch by 2 workers is; 2 hours.
However, since they took 1 hour turns on the job, it follows that; The total time used is;
Hence they could have finished the work in;
Read more on rate of work;