From the weekly output given, the average multifactor productivity will be 1.447.
From the complete information, the following can be deduced:
Week 1:
Input cost = 35660
Output cost = 51500
Week 2:
Input cost = 31800
Output cost = 45500
Week 3:
Input cost = 33500
Output cost = 49000
Week 4:
Input cost = 35160
Output cost = 51000
Total input cost:
= 35660 + 31800 + 33500 + 35160
= 136120
Total output cost:
= 51500 + 45509 + 49000 + 51000
= 197000
Average multifactor productivity
= Output / Input.
= 197000 / 136120
= 1.447