24/3 hours
Step-by-step explanation:
assuming the work speed of these 3 people are
a, b, c, (per hour)
So ba=8b=4c=M
T= M/a+b+c = M/ m/b+ m/8+m/4= 24/13 hours
Answer:
[tex]\frac{24}{13} \ [hour].[/tex]
Step-by-step explanation:
1) if all the work is 1, then the performance/efficiency/productivity for Abby is 1/6, for Brian is 1/8 and for Charles is 1/4;
2) if the performance/efficiency/productivity are 1/6; 1/8 and 1/4, then it is possible to make up for all work was done ('t' - required time):
[tex](\frac{1}{6} +\frac{1}{8} +\frac{1}{4} )*t=1;[/tex]
3) if to solve the equation above, then t=24/13 [hour]≈111 [min].
P.S. the suggested solution is not the only, there are several ways to solve this task.