This image may be the result of the

1. Construction for copying line AB

2. Construction of a line parallel to line AB through point P

3. Construction of a line perpendicular to line AB and line PU.

4. Construction of a line perpendicular to the line AB through point P

If mZRQS is 750, then mZTPU is

1. 15
2. 75
3. 105
4.150

This image may be the result of the 1 Construction for copying line AB2 Construction of a line parallel to line AB through point P3 Construction of a line perpe class=