Respuesta :

Answer:

  • Rs 46980

Step-by-step explanation:

Let the cost is x, we have then:

  • 1.2x*(0.87) = x + 1980
  • (1.2*0.87 - 1)x = 1980
  • 0.044x = 1980
  • x = 1980/0.044
  • x = 45000

Cost is 45000, then SP is:

  • SP = 45000 + 1980 = 46980