Factory overhead controllable variance Bellingham Company produced 15,200 units of product that required 4 standard direct labor hours per unit. The standard variable overhead cost per unit is $0.90 per direct labor hour. The actual variable factory overhead was $51,530.

Required:
Determine the variable factory overhead controllable variance.