Mickley Company’s plantwide predetermined overhead rate is $20.00 per direct labor-hour and its direct labor wage rate is $15.00 per hour. The following information pertains to Job A-500: Direct materials $ 280 Direct labor $ 150 Required: 1. What is the total manufacturing cost assigned to Job A-500? 2. If Job A-500 consists of 70 units, what is the unit product cost for this job? (Round your answer to 2 decimal places.)

Respuesta :

Answer and Explanation:

The computation is shown below;

1.

Total hours for job A - 500

= Direct labor ÷direct labor wage rate

= $150 ÷ $15

= 10

Total over head cost = overhead cost per labor hours × no. of labor hours

= $20 × 10

= $200

total manufacturing cost = Direct materials cost + Direct labor cost + Total over head cost

= $280 + $150 + $200

= $630

2.  

Cost assigned to each unit

= total manufacturing cost ÷  number of units

= $630 ÷ 70

= $9

ACCESS MORE