Respuesta :
8 pallets each hour so it would be 8 x 4 to find the answer. the answer is 32 pallets
Answer:
32
Step-by-step explanation:
1 hour = 60 minutes
Thus, 30 minutes if half an hour.
The worker can load 4 pallets every 30 minutes.
30*2=60
4*2=8
So the worker can load 8 pallets every 60 minutes, or every hour.
8*4=32
So, a worker can load 32 pallets in 4 hours.
BONUS: The worker can load 1 pallet every 7.5 minute
Brainliest pls