The potential difference between points A and B in an electric

field is 25.0 volts. How much work is required to transfer 10.0

coulombs of charge from A to B?

Respuesta :

Lanuel

Answer:

Work = 250 Joules.

Explanation:

Given the following data;

Potential difference, V = 25V

Charge, C = 10 Coulombs

To find the work required;

Work = Charge * potential difference

Substituting into the equation, we have

Work = 10*25

Work = 250 Joules.

Therefore, the amount of work required to move the charge from A to B is 250 Joules.

ACCESS MORE