Answer:
a.
E(y)=0.8
V(3y-10)=7.74
b.
The expected amount of surcharge is 117.5.
c.
The standard deviation of surcharges is 217.6723.
Step-by-step explanation:
a.
y 0 1 2 3
p(y) 0.5 0.25 0.2 0.05
y*p(y) 0 0.25 0.4 0.15
E(y)=sum(y*p(y))=0+0.25+0.4+0.15
E(y)=0.8.
y² 0 1 4 9
y²p(y) 0 0.25 0.8 0.45
V(y)=E(y²)-[E(y)]²
E(y²)=sum(y²*p(y))=0+0.25+0.8+0.45=1.5
V(y)=E(y²)-[E(y)]²
V(y)=1.5-[0.8]²
V(y)=1.5-0.64
V(y)=0.86
V(3y-10)=9V(y)=9*0.86=7.74
V(3y-10)=7.74
b.
E(95Y²-25)=95E(Y²)-25=95*1.5-25=142.5-25=117.5
E(95Y²-25)=117.5
The expected amount of surcharge is 117.5.
c.
SD(95Y²-25)=?
SD(95Y²-25)=√V(95Y²-25)
V(95Y²-25)=95²*V(Y²)
V(95Y²-25)=9025*V(Y²)
V(Y²)=E[(Y²)²]-[E(Y²)]²
y^4 0 1 16 81
y^4*p(y) 0 0.25 3.2 4.05
E[(Y²)²]=sum(y^4*p(y))=7.5
V(Y²)=E[(Y²)²]-[E(Y²)]²
V(Y²)=7.5-[1.5]²
V(Y²)=7.5-2.25
V(Y²)=5.25
V(95Y²-25)=9025*V(Y²)
V(95Y²-25)=9025*5.25
V(95Y²-25)=47381.25
SD(95Y²-25)=√47381.25
SD(95Y²-25)=217.6723
The standard deviation of surcharges is 217.6723.