Answer:
The project is environment friendly.
India has good wind potential to harness wind energy.
A permanent shield against ever increasing power prices. The cost per kwh reduces over a period of time as against rising cost for conventional power projects.
The cheapest source of electrical energy. (on a levelled cost over 20 years.)
Least equity participation required, as well as low cost debt is easily available to wind energy projects.
A project with the fastest payback period.
A real fast track power project, with the lowest gestation period; and a modular concept.
Operation and Maintenance (O&M) costs are low.
No marketing risks, as the product is electrical energy.
A project with no investment in manpower.
Explanation: