Respuesta :

Answer:

The project is environment friendly.

India has good wind potential to harness wind energy.

A permanent shield against ever increasing power prices. The cost per kwh reduces over a period of time as against rising cost for conventional power projects.

The cheapest source of electrical energy. (on a levelled cost over 20 years.)

Least equity participation required, as well as low cost debt is easily available to wind energy projects.

A project with the fastest payback period.

A real fast track power project, with the lowest gestation period; and a modular concept.

Operation and Maintenance (O&M) costs are low.

No marketing risks, as the product is electrical energy.

A project with no investment in manpower.