Respuesta :

Answer:

The contractor pays $1831.62 before taxes

Step-by-step explanation:

First, let's write the equation:

(145.98 x 9) + (129.45 x 4) = ?

145.98 multiplied by 9 is 1313.82

1313.82 + (129.45 x 4) = ?

129.45 multiplied by 4 is 517.8

1313.82 + 517.8 =

1831.62

I hope this helps :)

170,074 that the answer I believe but I’m not sure it just multiply
ACCESS MORE
EDU ACCESS
Universidad de Mexico