Answer:
If 10 men dig a ditch in 12 days .
Total man-days required to dig the ditch
= 10 men × 12 days
= 120 man-days
how long would 15 men take to dig it?
No of days required to finish the job by 15 men
= 120 men-days / 15 men
= 8 days
Answer: 8 days will be required to finish the job by 15 men