Eighteen men take 15 days
to dig 6 hectares of land
Find the number of men
required to dig 8 hectares
in 12 days?
​

Respuesta :

vintechnology vintechnology
  • 04-06-2020

Answer:

number of men = 30

Step-by-step explanation:

18 men takes 15 days to dig 6 hectares of land.

18 men will take 12 days to dig ? hectares of land

cross multiply

hectares of land = 12 × 6/15  

hectares of land = 72/15

hectares of land = 4.8 hectares

18 men will take 12 days to dig 4.8 hectares of land

? number of men will take 12 days to dig 8 hectares

cross multiply

number of men = 18 × 8/4.8

number of men = 144/4.8

number of men = 30

Answer Link

Otras preguntas

Please help me!!! !!!!!!!!!!!!!!!!!!!
A regular polygon has 60 sides.Find the size of each of its exterior angles.​
The radius of circle F is 19 cm. What is the length of its diameter? 9.5 cm 19 cm 21 cm 38 cm
i need help with this there is part a and b
What is the main function of the endocrine system? Pls use your own words
What are the rights given to people after the french revolution
ill give brainliest + 50 points Find the amount of savings in each instance
The table shows values of f(x) . x f(x) 0 3 1 6 2 0 3 9 4 2 What is f(3) ? Enter your answer in the box. f(3)= I think that the answer is 27 please co
7) An ionic bond could form between: (a) magnesium and potassium (b) fluoride and chloride (c) nitrogen and rubidium (d) chlorine and xenon Explanation:
what is the importance of tools and equipment? give at least 5 tools and equipment and their function?plssss.TLE- beauty care​