Answer:
4.5 hundreds dulcimers should be build to achieve the minimum average cost per dulcimer $ 1.7 hundreds.
Step-by-step explanation:
The average cost per dulcimer can be estimated by
C(x)=0.3x² -2.7x+7.775
where C(x) is hundreds of dollar, x hundred dulcimers are built.
C(x)=0.3x² -2.7x+7.775
Differentiating with respect to x
C'(x)=0.6x-2.7
Again differentiating with respect to x
C''(x)=0.6
For maximum or minimum C'(x)=0
0.6x-2.7=0
⇒0.6x=27
[tex]\Rightarrow x=\frac {2.7}{0.6}[/tex]
⇒ x= 4.5
Now [tex]C''(x)|_{x=4.5}= 0.6>0[/tex]
Since at x= 4.5 , C''(x)>0, So, the average cost per dulcimer is minimum.
C(4.5)= 0.3(4.5)²-2.7×4.5 +7.775×
=1.7
4.5 hundreds dulcimers should be build to achieve the minimum average cost per dulcimer $ 1.7 hundreds.