The Total cost for potential job is $36,800.
Explanation:
The potential cost is calculated as follows:
Direct Material $6,000
Direct Labour $16,000
Total Prime Costs $22,000
Overheads Cost:
(W-1) Maintenance: $12,800
(W-2) Inspection: $2,000
Total Job cost $36,800
Workings:
(W-1) Maintenance Overhead Rate is based on number of machine hours:
Formula: Total Maintenance cost/Total machine Hours
$800,000/25,000 = $32 per machine hours.
So the Maintenance cost for project is: 400 Machine hours × $32 = $ 12,800.
(W-2) Inspection Overhead Rate is based on inspection hours:
Formula: Total Inspection Cost/Total Inspection Hours
$400,000/800 = $500 per inspection hour
So the inspection cost for project is: 4 inspection hours × $500= $2,000
Answer:
total potential cost: 36,800
Explanation:
[tex]\frac{Cost\: Of \:Manufacturing \:Overhead}{Cost \:Driver}= Overhead \:Rate[/tex]
We divide the expense overhead over the cost driver.
Maintenance
800,000 / 25,000 = 32
Inspection
400,000 / 800 = 500
Applied overhead:
400 machine hours x $32 = $12,800
4 inspections x 500 = $2000
Total $14,800
The cost will be the three main component:
material + labor + overhead
Then, we have 6,000 materials plus 16,000 labor
total potential cost: 36,800