Answer:
117.25 days
Step-by-step explanation:
Total miles of a line= 2345 miles
Number of miles of lines checked daily= 20 miles
we have to find time period at which all miles are checked
Time Period = [tex]\frac{Total Number of miles to be checked}{Number of miles checked daily}[/tex]
Number of days =[tex]\frac{2345}{20}[/tex]
Number of days= 117.25
Hence 117.25 days are required to check all the lines of lines.
Hence, the correct answer is 117.25 days