Answer:
Total overhead= $550,000
Explanation:
Giving the following information:
The total fixed manufacturing overhead cost of $440,000
variable manufacturing overhead of $2.20 per machine-hour
50,000 machine-hours.
To calculate the total overhead, we need to sum to the fixed overhead the total variable manufacturing overhead:
Total overhead= 440,000 + 2.2*50,000= $550,000