Answer:
27.968 minutes
Step-by-step explanation:
let x be the original time it takes to make the piece. Given production time was cut down in two phases by 8% and 5%, the new time of the piece is calculated as:
[tex]t_0=x\\\\t_1=t_0\times(1-r_1),r_1=8\%\\\\t_1=t_0(1-0.08)\\\\t_1=0.92t_0\\\\t_2=t_1\times(1-r_2),r_2=5\%\\\\t_2=0.92t_0(1-0.05)\\\\t_2=0.92t_0\times0.95=0.874t_0[/tex]
We therefore substitute the initial time in the equation:
[tex]t_2=0.874t_0\\\\=0.874\times32 \ min\\\\=27.968 \ min[/tex]
Hence, it now takes 27.968 minutes to manufacture the piece.