Answer: $66, 600
Explanation:
Predetermined overhead rate = Estimated total manufacturing overhead cost ÷ Estimated total amount of the allocation base = $373,040 ÷ 60,800 direct labor-hours = $6.3 per direct labor-hour Overhead over or underapplied Actual MOH = $432,000 Applied MOH = $6.3 x 58000 = $365,400 Underapplied MOH = 432,000-365,400 = $66,60