Answer:
Predetermined overhead rate=$19.5/machine hour
The company applied $877500 to the units produced.
Explanation:
a) Pre-determined overhead rate= Budgeted overhead manufacturing cost
Estimated number of machine hours
=975000/50000=$19.5/machine hour.
b)Applied overhead = Pre-determined overhead rate * Actual machine hours
= 19.5 * 45000
=$877500.
c.
In traditional costing we use as base for calculating overhead rate is machine hours or labor hours but in activity based costing we identify activity that consume resources,identify cost driver of each activity,compute cost rate per cost driver unit and finally assign cost to products by multiplying cost driver rate.
Predetermined overhead rate= estimated overhead/Estimated base (cost driver).