Answer:
Option (b) is correct.
Explanation:
Given that,
Estimated total fixed manufacturing overhead = $121,000
Estimated direct labor-hours for the period = 10,000
Actual total fixed manufacturing overhead = $113,000
Actual total direct labor-hours during the period = 10,900
Predetermined overhead rate:
= Estimated total fixed manufacturing overhead ÷ Estimated direct labor hours
= $121,000 ÷ 10,000
= $12.10
Therefore, the predetermined overhead rate is closest to $12.10.