Respuesta :
Answer:
$6.00 per machine-hour
Explanation:
Total estimated manufacturing overhead = $300,000
Estimated machine hours = 50,000 hours
Predetermined overhead rate = Total estimated manufacturing overhead / Estimated machine hours
Predetermined overhead rate = $300,000 / 50,000 machine hours
Predetermined overhead rate = $6 per machine hour
So, The correct asnwer is $6.00 per machine-hour.
Answer:
$10 per MH
Explanation:
Estimated total overhead cost = $300,000 + ($4 per MH × 50,000 MHs) = $500,000
Predetermined overhead rate = Estimated total overhead cost of $500,000 ÷ 50,000 MHs = $10 per MH