Please answer, 100 points?!?
Anika is on the crew to set up rides for the state fair. The crew does most of the setup on the day that the
Tale anives at the fairground and then continues to work on finishing the setup for about a week to have the
rides ready to go in time for the opening of the fair. The scatter plot shows Anika's setup time on different
days and the linear model for the data
(a) What type of association is this scatter plot?
(b) What is the slope of the line drawn?

Respuesta :

Answer: (a) We will form an equation of line from the points given (6,10) and (2,15)

Using:

On substituting the values in the formula above we will get the required equation of line.

On simplification we will get:

(b) We need to tell at day 0 put x=0 in above equation:

Anika worked for 70 hours on the set up crew on the day the fair arrived at the fairgrounds day 0.

Now, we need to tell decrease per day which is equal to the slope of line

To find the slope compare the equation with general equation which is y=mx+c where m is slope

Here, in

 which is the decrease per day.

HOPE THIS HELPS!! :)

Also please mark brainliest!!

Answer:

Answer:

a) y = -7/5x + 17.8

b) Anika worked 17.8 hours on Day 0

c) Decreased by 7/5 in a day.

ACCESS MORE
EDU ACCESS