Answer:
198%
Explanation:
The computation of the predetermined overhead rate is shown below:
Predetermined overhead rate = (Total estimated manufacturing overhead) ÷ (estimated direct labor cost) × 100
= ($653,400 ÷ 330,000) × 100
= 198%
We simply divide the total estimated manufacturing overhead by the estimated direct labor cost so that the predetermined overhead rate can come