(a)mass [tex]m= 2.5 kg [/tex]
height [tex]h=6 m[/tex]
work required to raise
[tex]W=mgh[/tex]
[tex]W=2.5\times 9.8\times 6=147 J[/tex]
(b)Force [tex]F=20.8 N[/tex]
mass of cart [tex]m=3 kg[/tex]
length of track [tex]s=0.636 m[/tex]
[tex]Work\ done=F\cdot s[/tex]
Work done[tex]=20.8\cdot 0.636=13.22 J[/tex]
(c)mass of eddy [tex]m_e=65 kg[/tex]
height climbed [tex]h=1.6 m[/tex]
time [tex]t=1.2 s[/tex]
Energy required [tex]E=mgh=65\times 9.8\times 1.6=1019.2 J[/tex]
[tex]power=\frac{E}{t}=\frac{1019.2}{1.2}=849.33 W[/tex]