Answer:
Overhead absorption rate
= Overhead absorbed/Actual labour cost x 100
= $4,400/$800 x 100
= 550% of direct labour cost
Explanation:
Since the overhead absorbed is $4,400, there is need to divide the overhead absorbed by actual direct labour cost multiplied by 100. This gives the overhead application rate.