Bellingham Company produced 4,200 units of product that required 7 standard direct labor hours per unit. The standard variable overhead cost per unit is $2.70 per direct labor hour. The actual variable factory overhead was $77,470. Determine the variable factory overhead controllable variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.