Answer:
Parametric estimating
Explanation:
It is a calculation technique in which an algorithm is used to calculate the cost or duration based on historical data and project parameters.
The parametric estimation uses a statistical relationship between historical data and other variables (eg, square meters of construction) to calculate a variable of the parameters of an activity such as cost, budget and duration.