Answer:
Explanation:
The work done by the gravity simply is the difference in gravitational potential energy multiplied by -1:
[tex] W_g = - \Delta E_p = - (mgh_f - m g h_i)[/tex]
where m is the mass of the ball, g is the acceleration due to gravity, [tex]h_f[/tex] is the final height and [tex]h_i[/tex] is the initial height.
So, if the radius is 2.00 m, then the difference of height will be 4 meters:
[tex] W_g = - mg (h_f - h_i)[/tex]
[tex] W_g = - 3.00 \ kg \ 9.8 \frac{m}{s^2} \ 4 \m[/tex]
[tex] W_g = - 117.6 Joules [/tex]
As the tension is perpendicular to the velocity of the ball, the force is always perpendicular to the direction of motion. So, the differential of work will be:
[tex]dW = \vec{F} d\vec{r} = 0[/tex]