Answer:
The amount of manufacturing overhead that would have been applied to all jobs during the period is $1,289,340.00
Explanation:
For computing the manufacturing overhead, first, we have to compute the predetermined overhead rate which is shown below:
Predetermined overhead rate = (Total estimated manufacturing overhead) ÷ (estimated direct labor-hours)
= $684,000 ÷ 20,000 hours
= $34.20
Now the applied overhead would be equal to
= Actual direct labor-hours × predetermined overhead rate
= 37,700 hours × $34.20
= $1,289,340.00