Answer:
Job M-47 cost assinged $710
Explanation:
the cost is the sum of the three main component
materials
direct labor
manufacturing overhead (MO)
we will calculate each of this for the Job M-47 add them together to get total cost
Job M-47
material 260
15 labor hours
Direct Labor 15 labour hours x 12 labor rate = 180
MO 15 labour hours x 18 overhead rate = 270
Total Cost materials + labor + manufacturing overhead = 710