Answer:
$35.84 plantwide overhead rate.
Explanation:
[tex]\frac{Cost\: Of \:Manufacturing \:Overhead}{Cost \:Driver}= Overhead \:Rate[/tex]
We have to distribute the total overhead cost by the cost driver. In this case, machine hours
3,600,000 indirect labor + 880,000 factory utilities = 4,480,000 total overhead
cost driver: 125,000 machine hours
4,480,000 / 135,000 = $35.84 plantwide overhead rate.