The records at smith and jones, inc. show that job 110 is charged with $12,000 of direct materials and $11,000 of direct labor. smith and jones, inc. allocate manufacturing overhead at 85% of direct labor cost. what is the total cost of job no. 110?
a. $23,000
b. $32,350
c. $11,000
d. $33,200