deysifajardo2316 deysifajardo2316
  • 18-08-2018
  • Mathematics
contestada

Dan can tile a floor in 3 hours. his assistant could tile the same floor in 8 hours. if they work together, how long will it take to tile the floor?

Respuesta :

wolf1728
wolf1728 wolf1728
  • 18-08-2018

There is a formula for this:

Total Time = (worker1 * worker2) / (worker1 + worker2)

(3 * 8) / (3 + 8)

24 / 11 =

2.1818181818 hours


Answer Link

Otras preguntas

Any word, device (design, sound, shape, or color), or combination of these used to distinguish a seller's goods or services is referred to as a
Adjustments to timber management strategies meant to address long-term shortfalls will _______. a. result in immediate increases in available supplies b. lead
What can you conclude ?? Need answer soon
The elderly in the United States have become a. a small minority. c. a political force. b. the majority of the population. d. absent from the political scen
The conquistador who added the lands of the present day countries of peru, Ecuador, and Chile to the Spanish empire was?
All fungi are (1 point) photosynthetic. heterotrophic. autotrophic. parasitic.
Which statement best summarizes this excerpt from Leo Tolstoy’s The Death of Ivan Ilyich? And in imagination he began to recall the best moments of his pleasant
Airbags only absorb the _____ impact in a crash. initial final mid-stage smallest
what is 100% as decimals
Which written work is often read as a disguised criticism of England's imperialist activities?