Respuesta :
For this case, the first thing we must do is calculate the volume of the slab.
We have then:
V = (12) * (12) * (9 * (1/12))
V = 108 feet ^ 3
Making the conversion to cubic yards we have:
V = 108 * (1/3) ^ 3
V = 4 yd ^ 3
Then, the cost of concrete is given by:
C = (4) * (54)
C = 216 $
Answer:
The total cost of the concrete is:
C = 216 $
We have then:
V = (12) * (12) * (9 * (1/12))
V = 108 feet ^ 3
Making the conversion to cubic yards we have:
V = 108 * (1/3) ^ 3
V = 4 yd ^ 3
Then, the cost of concrete is given by:
C = (4) * (54)
C = 216 $
Answer:
The total cost of the concrete is:
C = 216 $