Identify a key feature associated with materials requirements planning.

a. Determining economic order quantity for all materials
b. Minimizing or eliminating carrying and stockout costs
c. Determining the optimal reorder points for all materials
d. Reducing required inventory levels by scheduling production, rather than estimating needs