8. a. What type of risk was measured in the analysis? Is this appropriate? If not, how could you measure the relevant risk of the project? b. In the analysis, you probably applied a single differential risk-adjusted discount rate to all cash flows, that is, to the cash flows of both stages. Does this make sense?